True full-scale build

On-Site Showroom
Step Into Our 1:1 Hotel Model
Guestrooms, materials and craftsmanship are confirmed inside our factory before export — built for overseas EPC owners who need zero-surprise delivery.
1:1 Showroom
Full-scale guestroom mock-ups — approve finishes before bulk FF&E ships overseas.
Live showroom
Inside our 1:1 hotel mock-ups
Guestrooms, materials and craftsmanship confirmed inside our factory before export — built for overseas EPC owners who need zero-surprise delivery.

Full-scale hotel mock-up
Guestroom and public-area finishes replicated in-factory before bulk FF&E — what you approve is what ships overseas.

E0 board grades & finish library
Brand-specified panels and veneers locked before cutting — export-grade environmental compliance.

Pre-export QC inspection
Festool-grade finishing checked under raking light — defects caught before container loading.

Upholstery & casegoods assembly
Headboards, seating and built-ins assembled to hotel operator standards inside our workshop.
1:1 Mock-up · Three Core Markets
Regional Showroom Planning
1:1 mock-up planning for Africa, the Middle East and Southeast Asia — climate specs, port workflows and tender deliverables.
AfricaDouala · Lagos · Tema
Africa Regional Showroom Planning
1:1 mock-up planning for humid climates — anti-termite specs, tropical substrates and Douala / Lagos / Tema port workflows before bulk FF&E.
- Moisture-resistant cores and sealed edges for tropical humidity
- Anti-termite options for guestroom fixed joinery
View regional planning
Middle EastDubai · Jeddah · Casablanca
Middle East Regional Showroom Planning
Fire-rated FF&E mock-ups, operator brand audits and Gulf / North Africa port clearance — showroom planning before mass PO.
- Fire-rated fabrics and substrates per project specification
- Brand-standard finishes for operator audits (200+ keys)
View regional planning
Southeast AsiaManila · Bangkok · Jakarta · Singapore
Southeast Asia Regional Showroom Planning
Tropical humidity specs, resort outdoor corners and apart-hotel modular packages — 1:1 planning for Manila, Bangkok, Jakarta and Singapore corridors.
- MR MDF / plywood selection for high-humidity guestrooms
- Outdoor & pool furniture material grades
View regional planning
Full-scale build
Owner sign-off
Rework savings
Owner sign-off before production
Typical on-site rework savings
What we deliver
Six integrated capabilities that replace multiple vendors with one accountable EPC partner.
Interior design & shop drawings
Space planning, material boards, guestroom layouts and construction drawings aligned with your operator brand standards.
Custom hotel furniture manufacturing
Case goods, vanities, wardrobes, loose furniture and public-area millwork from our 70,000 ㎡ factory with batch QC.
1:1 full-scale showroom
Real-size hotel rooms in our factory for quotation alignment and approval of size, finish and hardware before mass production.
Site construction & installation
Self-owned crews for on-site fit-out and installation, with waterproofing and finishing details for humid and coastal markets.
Export packing & global logistics
Export cartons, container loading plans, shipping documents and port-to-site coordination.
After-sales & spare-parts support
Warranty response, replacement hardware and guidance for overseas housekeeping and maintenance teams.
Standard workflow
From design to mass production
Approve inside our factory first, then launch batch guestroom and public-area FF&E manufacturing.
- Design
- 1:1 Build
- Check
- Adjust
- Mass Produce
Hotel EPC Packages — By Delivery Phase
Three commercial milestones — mock-up approval, full FF&E manufacturing, turnkey fit-out handover. Scope defined by BOQ, not a furniture SKU catalog.
Phase 1Phase 1 — Mock-up Approval & First Shipment
Lock finishes and dimensions in a 1:1 factory mock-up, then release the first production batch with export documents — ideal when opening dates are tight.
Typical 8–16 weeks
View scope & deliverables
Phase 2Phase 2 — Full FF&E Manufacturing & Delivery
Series production for all guestroom types and public areas — batch QC, phased containers and port-to-site coordination.
Typical 12–24 weeks
View scope & deliverables
Phase 3Phase 3 — Turnkey Fit-out & Handover
Single-contract hospitality EPC: manufacturing plus site fit-out, installation sequencing, punch list and handover documentation.
Typical 16–36 weeks
View scope & deliverables
Phase Comparison
Pick the contract phase that matches your opening rhythm — many projects start with Phase 1 only.
Frequently Asked Questions
How phase-based EPC contracts work and what to send for a quote.
Can we start with Phase 1 only?
Yes. Many overseas projects begin with Phase 1 to lock mock-up standards, then expand to Phase 2/3 under addenda aligned to your opening schedule.
How do phases map to a hotel EPC contract?
Phases are commercial milestones — not separate vendors. One PM structure can cover Phase 1 mock-up through Phase 3 handover when scope is defined in the BOQ.
What do I send for a package quotation?
Room matrix, target opening month, destination port, operator brand standards or drawings, and preferred phase (1, 2 or 3).
Request a Phased EPC Quote
Send room matrix, destination port, opening month and preferred phase — scoped proposal within 24 hours.
Contact project deskStep Into Our 1:1 Hotel Model
Reduce FF&E procurement and delivery risk for owners and contractors.
Zero Deviation
Real scene, real size, real effect — fully consistent with final project.
Save 30% Cost
Avoid on-site rework, reduce modification loss and control budget accurately.
Full Customization
Adjust layout, material and style freely until you are 100% satisfied.
Why leading brands choose 1:1 mock-ups
Compared with catalogue-only purchasing, YABO moves approval into the factory.
Visual approval
Traditional
Renderings and small swatches only
YABO 1:1 mock-up
Full-scale room — what you see is what ships
Change cost
Traditional
Costly on-site rework and delays
YABO 1:1 mock-up
Adjust in factory before batch run
Material sign-off
Traditional
Batch colour / grain mismatch
YABO 1:1 mock-up
Physical sign-off against mock-up
Overseas projects
Traditional
High cross-border coordination cost
YABO 1:1 mock-up
Video walk-through + checklist
What to approve during your visit
We recommend owners, designers and procurement leads complete this list together.
- Room layout, circulation and case-good dimensions
- Veneers, fabrics, hardware schedules
- Lighting effect and feature-wall details
- Minibar, wardrobe and vanity functions
- Export packing and container loading plan
Book a factory visit
Visit our Foshan HQ for 1:1 mock-ups and production lines. Overseas clients can request video tours with English support.
Book via WhatsApp