Phase 2 — Full FF&E Manufacturing & Delivery

Hotel EPC Package

Phase 2 — Full FF&E Manufacturing & Delivery

Series production for all guestroom types and public areas — batch QC, phased containers and port-to-site coordination.

Phase 212–24 weeks

Typical timeline

12–24 weeks

Deliverables

4 checklist items

Scope Included

  • Full BOQ manufacturing (guestrooms, lobby, F&B as contracted)
  • Batch QC and revision-controlled shop drawings
  • Export crating, moisture barriers and SKU labels
  • Phased ocean freight aligned to installation sequence
  • Spare parts kit (hinges, slides, touch-up)

Not Included by Default

  • 1:1 mock-up (if not completed in Phase 1)
  • Site installation and punch-list closure (Phase 3)
  • Lighting, mirrors, sanitaryware unless listed in BOQ

Deliverables Checklist

  • Batch manufacturing QC records
  • Pre-shipment inspection reports
  • Full commercial document set per container
  • Installation sequence drawing

Ideal For

  • · Hotels and apart-hotels with multiple room types
  • · Projects with GC-managed site but YABO-supplied FF&E
  • · Regional roll-outs across Africa, Middle East or Southeast Asia

Full-building packages quoted from complete BOQ and opening schedule.