Scope Included
- Full BOQ manufacturing (guestrooms, lobby, F&B as contracted)
- Batch QC and revision-controlled shop drawings
- Export crating, moisture barriers and SKU labels
- Phased ocean freight aligned to installation sequence
- Spare parts kit (hinges, slides, touch-up)
Not Included by Default
- 1:1 mock-up (if not completed in Phase 1)
- Site installation and punch-list closure (Phase 3)
- Lighting, mirrors, sanitaryware unless listed in BOQ
Deliverables Checklist
- Batch manufacturing QC records
- Pre-shipment inspection reports
- Full commercial document set per container
- Installation sequence drawing
Ideal For
- · Hotels and apart-hotels with multiple room types
- · Projects with GC-managed site but YABO-supplied FF&E
- · Regional roll-outs across Africa, Middle East or Southeast Asia
Full-building packages quoted from complete BOQ and opening schedule.