Phase 1 — Mock-up Approval & First Shipment

Hotel EPC Package

Phase 1 — Mock-up Approval & First Shipment

Lock finishes and dimensions in a 1:1 factory mock-up, then release the first production batch with export documents — ideal when opening dates are tight.

Phase 18–16 weeks

Typical timeline

8–16 weeks

Deliverables

4 checklist items

Scope Included

  • Design coordination and shop drawing review
  • 1:1 full-scale mock-up room build and sign-off
  • First-batch FF&E manufacturing (per agreed room types)
  • Pre-shipment QC and export packing
  • Commercial invoice, packing list and shipping documents

Not Included by Default

  • Full-building FF&E for all floors (Phase 2)
  • On-site installation labour (Phase 3)
  • MEP, fire protection and civil works by others
  • Operator-owned loose items (linen, appliances unless in BOQ)

Deliverables Checklist

  • Signed mock-up approval minutes
  • Frozen material and hardware schedule
  • Batch QC report and defect log
  • Container loading plan for first shipment

Ideal For

  • · Owners who need to freeze standards before full PO
  • · Phased openings by floor or wing
  • · First-time export to a new port

Typical starter: 20–50 keys or one room type — scope per BOQ.