Scope Included
- Design coordination and shop drawing review
- 1:1 full-scale mock-up room build and sign-off
- First-batch FF&E manufacturing (per agreed room types)
- Pre-shipment QC and export packing
- Commercial invoice, packing list and shipping documents
Not Included by Default
- Full-building FF&E for all floors (Phase 2)
- On-site installation labour (Phase 3)
- MEP, fire protection and civil works by others
- Operator-owned loose items (linen, appliances unless in BOQ)
Deliverables Checklist
- Signed mock-up approval minutes
- Frozen material and hardware schedule
- Batch QC report and defect log
- Container loading plan for first shipment
Ideal For
- · Owners who need to freeze standards before full PO
- · Phased openings by floor or wing
- · First-time export to a new port
Typical starter: 20–50 keys or one room type — scope per BOQ.