EPC Delivery Scope
- Design coordination & shop drawings
- 1:1 mock-up approval
- Guestroom & public-area FF&E
- Export logistics to Douala
- Site installation support
Production & Product Reference
Photos from Foshan Ronghetai (YABO official production base) international hotel portfolio — beds, wardrobes, desks and millwork.








On-site Implementation
Overseas installation and handover references from Foshan Ronghetai (rongtaif.com) international hotel portfolio — shown separately from production reference photos above.
Port: Douala
- 1. Mock-up signed
- 2. Ex-factory QC
- 3. Port arrival
- 4. Floor install
- 5. Handover
- Containers sequenced to floor installation order
- Guestroom punch-list support before handover
- Humidity-ready specs verified on site




Related contract phase: Phase 2 — Full FF&E Manufacturing & Delivery

An 86-key boutique hotel in Douala delivered under a single hospitality EPC contract — from shop drawings and 1:1 mock-up approval through FF&E manufacturing, export packing and site coordination.
Guestroom furniture reference
Photos from our official production base (Foshan Ronghetai) international hotel portfolio — bed frames, bedside tables, wardrobes and desks engineered for overseas hospitality projects.
EPC scope delivered
Interior design coordination and guestroom shop drawings
1:1 full-scale mock-up for material and dimension approval
Custom guestroom case goods, wardrobes and public-area millwork
Export-grade crating and consolidated shipping to Douala port
Installation sequence planning and punch-list support
Why this project matters
West Africa openings depend on humidity-ready specs and port documentation. We locked finishes in the mock-up room before bulk production, then phased shipments to match floor-by-floor installation.