March 22, 2023
Shop Drawings & Mock-up Room Approval Checklist (Before Mass Production)
A concise checklist to approve dimensions, finishes, hardware, lighting reflection and housekeeping workflow.

Mock-up approval is where most projects are saved — or lost. The point is not to see a pretty room, but to lock measurable decisions.
Checklist
Dimensions: key heights, clearances, door swings, access panels.
Finishes: color, grain direction, sheen, batch consistency.
Hardware: hinges, drawer slides, handles, locks, serviceability.
Power: outlet/USB positions, cable routing, safety.
Installation: fixing points, leveling, wall conditions.
Conclusion: once mock-up notes are signed, production becomes repeatable. Without it, every room becomes a change order.
Related buyer resources
Continue comparing scope, cost and delivery risk
Hotel Furniture Supplier for West Africa: Cameroon, Côte d'Ivoire & Ghana
Factory-direct hotel FF&E for Cameroon (Douala), Côte d'Ivoire (Abidjan) and Ghana (Tema) — port shipping, tropical specs and EPC support from our Foshan factory since 2019.
Hotel FF&E Scheduling: 7 Milestones That Protect Your Opening Date
Most opening delays are coordination failures — not design. Align mock-up, production, punch list and installation with this milestone map.
Hotel FF&E procurement questions
MOQ, quotation inputs, mock-up approval, payment terms, export packing, delivery and warranty answers.
