Shop Drawings & Mock-up Room Approval Checklist (Before Mass Production)

A concise checklist to approve dimensions, finishes, hardware, lighting reflection and housekeeping workflow.

Hotel guestroom mock-up for approval

Mock-up approval is where most projects are saved — or lost. The point is not to see a pretty room, but to lock measurable decisions.

Checklist

Dimensions: key heights, clearances, door swings, access panels.

Finishes: color, grain direction, sheen, batch consistency.

Hardware: hinges, drawer slides, handles, locks, serviceability.

Power: outlet/USB positions, cable routing, safety.

Installation: fixing points, leveling, wall conditions.

Conclusion: once mock-up notes are signed, production becomes repeatable. Without it, every room becomes a change order.